To the Ocean

I’m really excited that in just a few days all three boats will be on the trailer heading to Nags Head. I’ve been doing a bunch of little work on the boat to get ready. I drilled 5 holes in the boat and filled them with epoxy to make waterproof bushings for holes for lines. I removed the cheap plastic cleat from the front of the boat and drilled a large hole to tie a short painter. I drilled two more holes on the dagger board case to attach a piece of shock cord to hold the dagger board down. Finally I drilled two holes in the aft bulkhead wood to tie a line across the back of the boat to keep the tiller from slipping into the water when dropped. While I had the epoxy out, I filled the rudder mortise and then sanded it back to get a tight fit on the rudder arm. It’s not a perfect fit where the mortise and tenon come together, but it’s very tight now. The pin is decorative at this point. It’s not moving on its own.

I finished off the trailer by putting down 2″ of foam on the bed of the trailer and screwing down the outdoor carpet to it. I’m still thinking about the best way to tie down the kayaks on top. Right now I’m just using dock lines and truckers hitches. The good thing about that is that when they are off there’s nothing getting in the way of the skerry, but it’s not the fastest thing. Debating whether to keep one up there all the time for fast access to the water.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s